21205 UIRB UIRB 05527960 A 7/18/2000 8:15 REACH R DS side of bridge at highway 41 Stewart, Jana, Tegt, Sarah, Wolf, Julie Excellent Very Turbid, good depositional sites, good riparian corridor Not Modified 170 17 51 221 51 meters DS of HWY 41 Bridge 221 meters ds of hwy 41 bridge Very Turbid, good depositional sites, good riparian corridor 8/1/2000 15:28 6/25/2003 17:06